Track construction update

On Monday the 7th of March 2022, Whangawehi was a hive of activity. The track maintenance team was cutting branches to help with the graveling work. The repair work is now completed, and South Star delivered on site several machines to carry out the graveling work. A health and safety tour was organised to show the contractors the different access points, the general area and the different health and safety concerns to take into considerations in this type of environment. The work started on Tuesday the 8th of March on the steepest part of the track called Mamangu. The progress of the work will rely on weather conditions. We hope that the winter rain will hold off until the graveling work is finished. A big thank you to Westerlund Contracting Ltd and South Star trails Ltd for their support.

Walkway facilities update

The Whangawehi team is working hard at preparing the final touches along the walkway. The toilet facilities near the hut are now accessible via a wooden staircase. The hut has now a bench and a tank (not fitted yet). Hannah Coop, new owner of Taharoa has now blocked off the gaps that were used by birds to nest in the hut. With a fresh sweep, the hut is looking great.

Picnic tables and seats are in the process of being installed. Most interpretative signs and kilometre markers have been concreted in.