Whangawehi walkway July update

Winter has set in and ground conditions are now too wet to continue operating machineries. Todd Murphy from Tip Truck Limited has completed the first part of the post storm repair work. A big thank you for his support.

Several large culverts have been installed and a lot of water control measured carried out on the farm side of the fence have allowed a better control of the water coming from the hills. Culverts heads have been protected with concrete aprons. Flumes for our critical culverts have been ordered and one installed in the slip area. We cross our fingers and hope that the winter rains won’t create more damage on our infrastructures. We have done the best we could to avoid further degradations. We will keep you posted later on in the winter.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s