Walkway repairs

On the 20 th of April 2022, Todd Murphy came to Whangawehi to assess the damage created by the last storm. Todd has got a wealth of knowledge and will get underway in May once the weather has dried up the track. The storms that have hit the walkway have obliged the WCMG to future proof the infrastructure from severe weather events by increasing significantly the size of key culverts. This has significantly increased the cost of the project.

With the heath and safety induction carried out Todd is ready to start as soon as the weather allows.