Track update

On Thursday the 25th of February 2022, the walkway was a hive of activity. A digger operator completed an extensive track upgrade in the forestry with several culverts installed to capture excess water off the track. Several direction signs have also been installed. The signage work will continue once the tracks have dried up a bit more.

In the lower reaches, South Star is continuing the repair work with 2 diggers on site. The large slip has been worked with additional culverts and drainage systems installed. The track surface has been engineered to take the water off the track in the very steep parts.

The gravelling team is expected at the end of next week. We hope the weather is going to hold.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s