On Wednesday the 9th of February 2022, South Star Trails started the repair work along the walkway. The task is significant and will require building retaining walls, clearing slips and installing several extra culverts. The work should last between 3 to 4 weeks.
We hope that the gravelling team will be on site very soon to start the long gravelling work along the river. We will keep you in the loop.




