On Friday the 19 th of June, several contractors followed a health and Safety induction prior to starting the work along the Whangawehi walkway. The group was presented a work plan, a hazard identification document as well as an emergency procedure protocole.
The group is now ready to start the work which will consist in clearing the track and cutting over hanging branches.